Chen Ping, a 34-year-old senior technician, has been working as a scraper driver in the Mining Area III of Jinchuan Group since 2011. After a dozen years of study and practice, he is proficient in running the gigantic machines.
When it comes to innovation, the fact that a tiny success comes after thousands of failures is a hard-learned lesson known to all inventors. And this is reflected throughout Yang Bingsong's career.
Ding Ke, head of the construction engineering survey team of the geologic survey division at Jinchuan Group’s Longshou Mine, was born in December 1976.
Yang Guohui, head of the production unit at the second mining zone of Jinchuan Group’s mining area II, was born in September 1984.
Ma Sibing, head of the maintenance unit of the improvement work zone at Jinchuan Group’s mining area III, was born in May 1975.
Han Deshun, head of scraper group A of the first mechanized excavation team at Jinchuan Group’s Mining Engineering Company, was born in October 1973.
Liu Lijun is head of the self-heating furnace system production group of the copper smelting workshop at Jinchuan Group’s nickel smelting plant.
Jing Yuhong is head of the electrolysis group of the second electrolysis plant at Jinchuan Group Copper Co Ltd, a Party member and a senior technician of the electrolytic refiner.